AIM 5: How
Technology Supports Effective and Efficient Operations
|
|
|||
|
Strategic Goal:
(Please check.)
Components of the education system aligned to achieve high
performance
Decision making authority and control at the most appropriate level
closest to the classroom
Information and accountability systems capable of reporting
strategic and operational results
A funding system that provides adequate and aligned financial
and personnel resources to maximize educational achievement |
|||
|
Objective
5.1 Promote and maintain efficient management and operations across the
system. |
|||
|
Strategy |
Time-line |
Method of Evaluation |
Evaluation
Results July, 2007 |
|
5.1a Provide students and teachers
with Internet Safety and Technology Acceptable Use policies. |
2005-2010 with annual benchmarks and evaluations in October |
Acceptable Use Database |
This
has achieved greater focus because of threats such as cyber predation and
bullying. This topic is treated on the school planner for ’06-’07 in three
distinct items. Further, Internet Safety Week
is being planned for 9/18-22 in our school system. We use a feature in our
library automation system that allows us to track students with signed AUPs
from school to school. |
|
5.1b Refine Computer
Utilization Survey and tie it to achievement |
2005-2010 with annual benchmarks
and evaluations in November |
Annual statistical
summaries and EOG/EOC data |
A brief blog entry about
it. The major work on this project is
done during the summer months…and is conveyed to principals during the July
visits. Trying to tie computer
utilization to academic achievement is a worthy goal but, in reality, next to
impossible. |
|
5.1c Ensure adequate
staffing levels in media and technology to meet the needs of students and
staff. |
2005-2010 with annual benchmarks
and evaluations in November |
Staffing levels
inventory |
We are in the best
position in years. We have gained
IMPACT positions so that 10 schools have full-time ITFs and 6 have half-time
ITFs. All have certified MCs. Our job is two-fold. First, we must move the half-timers to
full-timers. Second, we must replace
retiring folks with the best professionals our money can buy. |
|
5.1d Provide training to NC
WISE leadership personnel in use of software (such as databases and
spreadsheets) needed to further analyze NC WISE student data. |
2005-2007 with quarterly benchmarks
and evaluations |
Workshop evals |
This is underway slowly. Our initiation into NCWise has been
delayed until SY07-08. |
|
5.1e Establish an NC WISE
steering committee that includes school and central office personnel to
implement NC WISE conversion in the 2006-07 school year.
|
2005-2006 |
Timelines |
Complete, however our initiation into NCWise has been delayed until SY07-08. |
|
5.1f Develop a school level
training plan that uses web-based training and other resources to introduce
and maximize NC WISE usage across the system. |
2005-2010 with annual benchmarks and evaluations in July |
Participation rates |
This is
underway slowly. Our initiation into NCWise has been delayed until SY07-08. |
|
|
|||
|
Objective
5.2 Demonstrate accountability for all
budgeted and expended funds. |
|||
|
5.2a Convey funding
priorities in simplified and consistent form to decision makers and funders. |
2005-2010 with benchmarks and evaluations April through July |
Funding dollars |
Some success
here. Because of the intense scrutiny
under which we operate, our funding processes have improved over time. In fact, this marks the first in five years
that the BOE has approved the entire technology request. I have voiced a concern, though. Our process, which essentially requires
budget requests around November, limits flexibility. Needs change in the interim months before
the process concludes, and we have little recourse to modify requests. |
|
5.2b |
2005-2010 with monthly benchmarks and evaluations |
Responses to help desk
|
NA—Our initiation into NCWise has been
delayed until SY07-08. |
|
5.2c Establish a contingency
budget, submitted annually, to provide for any unanticipated upgrades needed
for NC WISE access and data entry. |
2005-2010 with benchmarks and evaluations April through July |
Ability to pay for
needs |
Although, our initiation into NCWise has
been delayed until SY07-08, this is one area that could be getting greater
attention. |
|
|
|||
|
Objective
5.3 Maintain and provide
quality facilities. |
|||
|
5.3a Migrate e-mail to a centralized solution. |
2006-2007 |
Adherence to
Completion Timetables and efficiency of migration |
|
|
5.3b Migrate library automation to a centralized, web-based solution. |
2006 |
Adherence to
Completion Timetables and efficiency of migration |
The migration from
Sagebrush Spectrum to Follett Destiny took 10 months of careful planning
and implementation. It stands as a
model of one of the most seamless implementations we have done. |
|
5.3c Maintain bandwidth at
levels that support needs of users. |
Adherence to
Completion Timetables and efficiency of migration |
Bandwidth tests NCWise reports |
This has been several years
in the making. Effective July 1, 2006,
we are in 3-yr contract w/ Time Warner Cable.
This deal substantially increases our connectivity among schools and
to the Internet. Job’s done…for now. |
|
|
|||
|
Objective
5.4 Maintain technology
and upgrade annually. |
|||
|
5.4a Move computer
refreshment closer to the 3-5 year cycle recommended by Department Of
Education |
2005-2010 with benchmarks and evaluations April through July |
Annual Media and
Technology Reports TCO reports |
Our refreshment
campaign has been well documented and publicized. This year |
|
5.4b Maintain current
inventory of all computers with respect to specifications put forward by
system's technology team for meeting NC WISE usage requirements. |
2005-2010 with benchmarks and evaluations April through July |
Annual Media and
Technology Reports TCO reports |
As of 9/22/06, we have 362
teachers not compliant with NC Wise by our standards. We are optimistic that this will be
addressed in the forthcoming local capital budget. |
|
5.4c Maintain current
inventory of all computers with respect to specifications put forward by
system's technology team for meeting Exceptional Children’s information
system |
2005-2010 with benchmarks and evaluations April through July |
Annual Media and
Technology Reports TCO reports |
|