Home General Bond Project Information Summary of Major
Bond Projects
Work Taking Place           


Five bond projects reviewed, savings outlined at
April 12, 2006, special Board of Education meeting

A special Board of Education meeting took place Wednesday, April 12, 2006, for the purpose of reviewing the report compiled by Carteret County Schools Construction Management Firm (Keith Maready & Associates, LLC). 

The study was conducted and reports compiled with reference to the five bond projects involving renovations and new construction - Bogue Sound Elementary, Croatan High auditorium, East Carteret High, Newport Elementary and White Oak Elementary. The projects are currently under the direction of SFL+a Architects.

Keith Maready presented the reports and indicated the study was concluded from the following resources: three unaffiliated architectural firms; two unaffiliated general contractors; the North Carolina Department of Public Instruction; three Eastern North Carolina school systems with active bond programs; and his own experience as general contractor and construction manager.

Keith Maready indicated three possible areas for cost savings in the projects:  (1)  reduction of design fees by Carteret County Schools taking leadership of items, such as painting, floor covering, window and door replacement and others, (2) reduction of profits by contractors by Carteret County Schools taking leadership of the above referenced items, and (3) reduction of inflation rates by early performance.  He also indicated the unit costs of $146.00 per square foot for classroom and accessory space additions are achievable, and $230.00 per square foot is achievable for auditorium construction. These costs are significantly less than the architectural firm’s early concept work projections.

In summary, the bond projects scope of work can be achieved for the approved bond value on four of the five projects, with the construction of the auditorium at Croatan High being the exception. Study is in process on the remainder of the bond projects.  Below is a summary of reports presented April 12 by Keith Maready & Associates.

BOGUE SOUND ELEMENTARY SCHOOL

            Approved bond value                                                   $ 1,787,616

            Projected cost to provide scope of work                        $ 1,771,369

            Projected Savings                                                        $      16,247

 

CROATAN HIGH SCHOOL       

            Approved bond value                                                   $ 3,320,898

            Projected cost to provided scope of work                        $ 4,095,445

            Projected overage                                                       $    774,547

*Auditorium projected cost is based on seating capacity of 560.

 

EAST CARTERET HIGH SCHOOL

            Approved bond value (2 Bonds)                                 $13,412,652

            Projected cost to provide scope of work                        $13,129,421

            Projected savings                                                         $      283,231

*Bond value approved for new construction is $4,116,675 and is included in the above. New construction can be achieved for approved value.

NEWPORT ELEMENTARY SCHOOL

            Approved bond value                                                   $ 6,249,941

            Projected cost to provide scope of work                        $ 6,192,912

            Projected savings                                                         $      57,029

 

WHITE OAK ELEMENTARY SCHOOL

            Approved bond value                                                   $ 6,353,778

            Projected cost to provide scope of work                        $ 6,257,058

            Projected savings                                                         $       96,720

*Bond projected “New Metal Roof” with value approved at $682,044.  Value approved will not provide “New Metal Roof”; projected cost for new metal roof is $800,000.  New sloped roof with 20 year warranty can be provided for bond value.

 