Home
About System/BOE
Cafeterias
Calendars
Career/Tech Ed.
Closings/Delays
Curriculum/Instruction
Directories
Exceptional Children
Finance
Guidance
Health/Nurses
Human Resources
Links
Maintenance/Warehouse
News/Communications
Parent Tips/Info.
Policy Manual
Schools
Senior Citizen Card
Student Insurance
Superintendent
Technology/Media
Testing/Accountability
Transportation
Home General Bond Project Information Summary of Major
Bond Projects
Work Taking Place           

Terracon Engineering performs core drills at East Carteret High School

Representatives from Terracon Engineering, Greenville, spent March 23-24, 2006, making core drills in floors throughout East Carteret High School.

Pictured are Terracon Engineering representatives, Brad Griffin, left, and Thomas Bryant, right, as Bond Projects Manager Keith Maready looks on. 

According to Mr. Maready, the core drills were done to gain information about conditions under the finished floor. The information will provide him with the bearing capabilities of the existing structure and with information about the soil conditions below the floor. 


            

Carteret County Public School System
107 Safrit Dr.
Beaufort, NC 28516
(252) 728-4583 Fax: (252) 728-3028
Contact Us

Hit Counter